Key Components
Soil Testing & Engineering
- Soil classification (M, H1, H2, E grades) determines soil reactivity and slab design needs
- Geotechnical reports provide footing and drainage specifications
Site Preparation
- Land leveling through cut and fill operations
- Vegetation and tree removal
- Rock excavation (often charged as variations)
- Temporary fencing installation
Slab & Footings Preparation
- Slab type upgrades based on soil classification
- Deepened footings for poor soil or sloped blocks
Drainage and Stormwater
- Stormwater management systems (pits, pipes, trenches)
- Surface drainage and retaining walls for sloped properties
Services Connection
- Sewer and stormwater connections
- Water and power to the dwelling
- NBN and communications infrastructure
- Gas connections where applicable
Temporary Works
- Site facilities (toilets, power poles, signage)
- Sediment control measures
Council & Compliance
- Building approval and inspection fees
- Traffic or asset protection bonds